Ultra long duration energy storage project development studies

UK registered businesses can apply for a share of up to £3 million for project development studies to support the development of ultra long duration batteries and battery energy storage demonstrators in the UK.
Registration Details

03/08/2026 30/09/2026 11:00
Award

Your project’s total eligible grant funding request must be between £350,000 and £700,000. This can cover up to 70% of costs depending on business size.
Organisation

UKRI
Find out more and apply

Please note that this competition has been relaunched with some changes to the Scope section; the revised competition retains the original closing date of 11am on Wednesday 30 Sep 2026. The previous version of the competition was closed on 11 Sep 2026 and replaced by the new competition. Please make sure you have read the scope for the new competition in full before applying. If you have started or submitted an application to the previous version of the competition, you will need to submit a new application through the revised competition and ensure that your project remains within scope. Changes are shown in bold on this page.

In particular, please review the list of exclusions below, which has changed since the previous version of the competition: the competition now excludes lithium-ion, hydrogen fuel cell, or lead-acid technologies, combustion of molecules to produce electricity, and technologies that store energy in the form of thermal, mechanical, or electrical energy.

About the competition

Innovate UK, part of UK Research and Innovation (UKRI), will invest up to £3 million from the UKRI R&D Missions Accelerator Programme in this competition. This is to support the delivery of electrochemical ultra long duration energy storage (ULDES) project development studies in Phase 1.

This is subject to a sufficient number of high quality applications being received.

The aim of this competition is to support the development, scale-up, and UK manufacture of electrochemical ULDES technologies. These ULDES technologies must be capable of delivering cost effective electrical power to the UK’s electricity grid with a discharge availability of at least 100 continuous hours at rated power, regardless of the time required to charge the system. They must also achieve a working life of at least 25 years.

Your project under Phase 1 must show a clear route to construction and operation in the UK, with a specific site identified as part of the project development study.

  • Lead organisation

    To lead a collaborative project or to work alone, your organisation must be a UK registered business of any size.

    More information on the different types of organisation can be found in our Funding rules.

    Academic institutions cannot lead or work alone.

    Project team

    To collaborate with the lead, your organisation must be one of the following UK registered:

    • business of any size
    • academic institution
    • charity
    • not for profit
    • public sector organisation
    • research and technology organisation (RTO)

    If your project is collaborative, you must ensure no single organisation claims more than 70% of the total project costs.

    Number of applications

    An eligible organisation can only lead on one application.

    An eligible organisation that is leading an application can be included as a collaborator in a further two applications. An eligible organisation that is not leading an application can collaborate in any number of applications.

  • We welcome and encourage applications from people of all backgrounds and are committed to making our application process accessible to everyone. This includes making reasonable adjustments for people who have a disability or a long-term condition and face barriers applying to us.

    You can contact us at any time to ask for guidance.

    We recommend you contact us at least 15 working days before this competition’s closing date to allow us to put the most suitable support in place. The support we can provide may be limited if you contact us close to the competition deadline.

    You can contact Innovate UK by email or call 0300 321 4357. Our phone lines are open from 9am to 12pm and 2pm to 5pm UK time, Monday to Friday (excluding bank holidays).

  • Your project must:

    • have a grant funding request of between £350,000 and £700,000
    • last between 3 and 9 months
    • start by 1 January 2027
    • end by 30 September 2027

    Any organisation receiving funding must carry out its project work in the UK, intend to exploit the results in the UK, and spend most of the funding within the UK.

    This Phase 1 competition is providing funding for project development studies (formally classified as feasibility studies) to strengthen demonstration project proposals under the planned future Phase 2 competition. A first draft of your project development study must be completed by 31 May 2027. This is to ensure that your project is able to inform your application to a Phase 2 competition.

    Your project under Phase 1 must show a clear route to construction and operation in the UK, with a specific site identified as part of the project development study. Your selected site may be located at a demonstration or test facility that you have an arrangement with, a facility you already own, or within a greenfield development. Your choice of proposed site will be considered in the context of the maturity and scale of your technology.

    You must demonstrate a credible route to deployment, including how you will secure any outstanding permits, consents, infrastructure and site arrangements within the project timescales. Any site preparation and development risks must be clearly outlined. Project sponsors must prioritise sites that minimise such risks.

    Your project development study must contain, as a minimum:

    • technology assessment
    • engineering design
    • cost and scale-up roadmap
    • market assessment
    • development plan
    • manufacturing and supply chain plan
  • Changes from the previous scope are shown in bold below.

    The aim of this competition is to support the development, scale-up, and UK manufacture of electrochemical ultra long duration energy storage (ULDES) technologies. These ULDES technologies must be capable of delivering cost effective electrical power to the UK’s electricity grid with a discharge availability of at least 100 continuous hours at rated power, regardless of the time required to charge the system. They must also achieve a working life of at least 25 years.

    Your project must:

    • involve the proposed deployment of electrochemical ULDES technologies which have a round trip power to power cycle, where electricity is used to charge the system and electricity is produced on discharge
    • fulfil the requirements under one of the two streams outlined in this section
    • support a planned UK demonstration project by 2030, meeting the scale and timetable requirements of your selected stream, as part of a pathway to scalable deployment in the UK energy system
    • demonstrate that the proposed lead or team has the capabilities required to progress from project development studies through to demonstration and deployment

    A technology neutral approach has been adopted within defined boundaries.

  • These have changed since the original publication: please consult the revised competition page to ensure you have the correct details. Sections which have changed are shown in bold.

    Stream 1: near commercial scale-up

    Stream 1 aims to develop and demonstrate near commercial electrochemical ULDES systems that have the potential to achieve installed system costs of $40/kWh or less, by 2030.

    Your project must:

    • feature an electrochemical ULDES technology able to store energy for several days and provide intraday and interday energy arbitrage, uninterruptible power supply (UPS) and backup power for long outages including commercial and industrial applications and critical infrastructure
    • plan to deliver a grid connected demonstration project of at least 1 MW and 100 MWh (rated to discharge) by 2030
    • envisage achieving a total installed cost of US$40/kWh, or less, by 2030
    • provide a commercialisation plan showing how the technology will scale in the UK energy system
    • demonstrate your ambition for developing UK manufacturing capacity and building domestic supply chains
    Stream 2: system innovation and low cost pathways

    Stream 2 aims to develop early stage electrochemical ULDES technologies that have the potential to achieve installed system costs of US$15/kWh or less, by 2035.

    Your project must:

    • feature an electrochemical ULDES technology that can provide monthly and seasonal energy arbitrage, equivalent to a UK strategic reserve, demonstrating the potential for minimal degradation or self discharge over long periods
    • plan to deliver a grid connected pilot demonstration project of at least 1kW and 100 kWh (rated to discharge) by 2030
    • envisage achieving a total installed cost of $15/kWh, or less, by 2035
    • provide a commercialisation plan showing how the technology will scale in the UK energy system
    • demonstrate your ambition for developing UK manufacturing capacity and building domestic supply chains
    System costs calculation

    (this section was not included in the original competition brief)

    Installed system costs include the total system CAPEX required to deliver a storage system with a 25 year system lifetime, including the capital cost of any component replacement required during that period, but excluding grid connection costs. Installed system costs are different from total cost of ownership (TCO) and levelised cost of storage (LCOS). You do not need to provide LCOS or net present value (NPV) calculations as part of your application.

    If you choose to include LCOS and NVP calculations, you must clearly state your assumptions, including:

    • cycles per year
    • charging electricity price
    • discount rate
    • system lifetime
    • efficiency
    • degradation

    The core storage cost assessment must exclude additional revenue streams. You can provide information on potential additional revenue streams separately.

  • Changes to the previous list of exclusions are shown in bold below.

    We are not funding projects that are:

    • focused on laboratory scale or early stage discovery research
    • limited to component, material or subsystem development, or manufacturing process optimisation
    • focused on incremental improvements to existing short duration battery energy storage technologies
    • focused on the development or deployment of lithium ion, hydrogen fuel cell or lead acid technologies
    • focused on the combustion of hydrogen, or other molecules, to produce electricity
    • focused on technologies that store energy in the form of thermal, mechanical or electrical energy, including molten salts, compressed air, pumped-hydro storage and capacitors
  • 7 August 2026: Online briefing event: watch the recording here

    27 August 2026: informal ‘drop-in’ surgery to ask any questions you may have about your application. Download the surgery Q&A.

    2 November 2026: Applicants notified

    1 January 2027: Project start by

  • An online briefing event was held on 7 August 2026 (recording link below) and a surgery on 27 August at 13:30 (not recorded).

    View the briefing event recording, slides and Q&A.

    Download the surgery Q&A.

    If you would like help to find a collaboration partner, contact Innovate UK Business Connect’s Energy team.

Innovate UK's application and funding process

If you need more information about how to apply, please read our funding support pages. For additional support, reach out to our team of innovation experts who are ready to help you navigate the application process and maximise your chances of success.

For more information

Application support and guidance

Accessibility and Inclusion

Innovate UK welcome and encourage applications from people of all backgrounds and are committed to making our application process accessible to everyone. This includes making reasonable adjustments, for people who have a disability or a long-term condition and face barriers applying to us.

Related event

Get in touch

If you have any questions about the scope requirements of this competition, email support@iuk.ukri.org or call 0300 321 4357.


Our phone lines are open from 9am to 5pm, Monday to Friday (excluding bank holidays).

Sector

This opportunity is part of Energy.

Innovate UK Business Connect’s Energy Team is at the centre of our work contributing to delivering the UK’s ambitious Net Zero targets. With specialists in Nuclear, Offshore Wind, Thermal Energy Systems, Batteries, Water, Hydrogen, Sustainable Energy, Grid and Distributed Systems, Electrical Energy Systems and Solar, the team has deep expertise, powerful connections and a track record of successful projects delivering environmental and societal impact.

Find out more
Close

Connect with Innovate UK Business Connect

Join Innovate UK Business Connect's mailing list to receive updates on funding opportunities, events and to access Innovate UK Business Connect's deep expertise. Please check your email to confirm your subscription and select your area(s) of interest.